Coalition member Omega Morgan completed a study documenting the preferred route for a high, wide and heavy corridor. They loaded three water purification tanks to barge in Portland, Oregon, offloaded the barge in Umatilla, Oregon, and transported them over the road through Oregon, Idaho and Montana to the project site in Fort McMurray, Alberta, Canada. This route proved that transporting high, wide and heavy loads safely and without environmental impact is possible.

EQUIPMENT USED:

Suspension Beam Trailer

WATER PURIFICATION TANKS PROJECT SPECS:

3 Tanks: 16 ft. diameter; 96 ft. long, 350,000 lbs.; GVW: 940,000 lbs.; Overall Vehicle Length: 385 ft.; Overall Vehicle Width: 22 ft.; Overall Vehicle Height: 19 ft.

Route used for case study

Route used for case study

HWH Corridor Steering Committee

GET IN TOUCH

For more information or to join, contact Erik Zander
5036477474
erik@omegamorgan.com

HOW YOU CAN HELP
Join the Coalition, add your perspective and be part of promoting and developing our region as the leading destination for these cargoes to support industry and our regional economy.

SIGN UP FOR HWH NEWS